Marysville Place
Marysville Place is an operational data center in Fredericton Northside, Canada. Our footprint estimate of its power is about 16 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 16 MW (range 7.9 MW to 25 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,290 m² building outline x 2.5 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | McGloin Street 20 |
| Coordinates | 45.97824, -66.58879 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Marysville Place use?
We estimate the facility power at about 16 MW. Estimate from building footprint, low confidence.
Data centers near Fredericton Northside
- Equinix SJ1 - Saint John 85.2 km
- PureColo STJ01 (Saint John) 88.6 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.