LTD Irida Telecom
LTD Irida Telecom is an operational data center operated by Alexander Galchenko in Rostov-on-Don, Russia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Alexander Galchenko |
| Networks | 1 networks PeeringDB. |
| Address | Sokolova 85/3 |
| Coordinates | 47.23524, 39.71517 |
| Website | timernet.ru |
Power and grid
| Grid carbon intensity | 447 g CO₂ per kWh (Russia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 45.6%, nuclear 18.3%, coal 17.7%, hydro 16.7%, oil and other fossil 1%. Clean power: 35.7% |
Climate and water
| Average temperature | 11.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.9 °C (2001 to 2025) |
| Cooling degree days | 653 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.64 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Rostov) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for LTD Irida Telecom?
The grid in Russia emits about 447 g CO₂ per kWh (2025). Largest sources: gas 45.6%, nuclear 18.3%, coal 17.7%.
Who operates LTD Irida Telecom?
Alexander Galchenko.
Data centers near Rostov-on-Don
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.