LEDC - TMW1 - Tamworth
LEDC - TMW1 - Tamworth is an operational data center operated by Leading Edge Data Centre in North Tamworth, Australia. Our footprint estimate of its power is about 0.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Leading Edge Data Centre |
| Facility power | 0.6 MW (range 0.3 MW to 0.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 471 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 260 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Johnston Street 140-148, 2340 |
| Coordinates | -31.07421, 150.92160 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does LEDC - TMW1 - Tamworth use?
We estimate the facility power at about 0.6 MW. Estimate from building footprint, low confidence.
Who operates LEDC - TMW1 - Tamworth?
Leading Edge Data Centre.
Data centers near North Tamworth
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.