LEDC - ABX1 - Albury
LEDC - ABX1 - Albury is an operational data center operated by Leading Edge Data Centres in East Albury, Australia. Our footprint estimate of its power is about 0.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Leading Edge Data Centres |
| Facility power | 0.5 MW (range 0.3 MW to 0.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 442 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 210 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Avalon Street 17, 2640 |
| Coordinates | -36.07126, 146.95522 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does LEDC - ABX1 - Albury use?
We estimate the facility power at about 0.5 MW. Estimate from building footprint, low confidence.
Who operates LEDC - ABX1 - Albury?
Leading Edge Data Centres.
Data centers near East Albury
- EC5 Albury 3.4 km
More Leading Edge Data Centres data centers
- LEDC - DBO1 - Dubbo Australia
- LEDC - CFS1 - Coffs Harbour Australia
- LEDC - NTL1 - Newcastle Australia
- LEDC - TMW1 - Tamworth Australia
- LEDC - WGA1 - Wagga Wagga Australia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.