Транстелеком

Транстелеком is an operational data center in Karagandy, Kazakhstan. Our footprint estimate of its power is about 2.6 MW.

Key facts

StatusOperational
Facility power2.6 MW (range 1.3 MW to 4.2 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,176 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates49.82136, 73.15604

Satellite view

Questions

How much power does Транстелеком use?

We estimate the facility power at about 2.6 MW. Estimate from building footprint, low confidence.