Joule House

Joule House is an operational data center operated by Equinix in Old Trafford, United Kingdom. Our footprint estimate of its power is about 4.5 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power4.5 MW (range 2.2 MW to 7.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,709 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressTrafford Wharf Road 76, M17 1HE
Coordinates53.46802, -2.29342
Websiteequinix.co.uk/locations/europe-colocation/united-kingdom-colocation/manchester-data-centers/ma3

Satellite view

Questions

How much power does Joule House use?

We estimate the facility power at about 4.5 MW. Estimate from building footprint, low confidence.

Who operates Joule House?

Equinix.