Data Center Directory

iLevant Aqaba

iLevant Aqaba is an operational data center operated by iLevant FZE in Aqaba, Jordan. No power figure is public for this site yet.

Key facts

StatusOperational
OperatoriLevant FZE
Networks5 networks, 1 internet exchanges
PeeringDB.
Also known asNaiTel Aqaba
AddressKing Abdullah St. 41
Coordinates29.53208, 35.01040
Websiteilevant.com

Power and grid

Grid carbon intensity490 g CO₂ per kWh (Jordan, 2024)
Average of all power made in the area. Ember.
Grid power mixgas 56.9%, solar 23.5%, oil and other fossil 12.8%, wind 6.8%. Clean power: 30.3%

Climate and water

Water stress todayHigh (40-80%) (Aqaba)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How clean is the power for iLevant Aqaba?

The grid in Jordan emits about 490 g CO₂ per kWh (2024). Largest sources: gas 56.9%, solar 23.5%, oil and other fossil 12.8%.

Who operates iLevant Aqaba?

iLevant FZE.

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.