Huawei Horinger
Huawei Horinger is an operational data center that is still expanding, operated by Huawei in Horinger, China. Its power is about 212 MW, growing to about 439 MW by 2028-02. Epoch AI estimates about 81,000 H100-equivalent AI chips (Ascend 910C, Ascend 910B).
Power demand is growing at this site
Key facts
| Status | Operational, expanding |
|---|---|
| Operator | Huawei |
| Facility power | 212 MW Reported (Epoch AI or owner data) |
| IT power | 170 MW |
| Planned power | 439 MW by 2028-02-17 Epoch AI timeline projection. |
| AI compute | 81,000 H100-equivalents → 141,000 planned |
| AI chips | Ascend 910C, Ascend 910B Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 94,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 6.4 billion → 13.3 billion planned Epoch AI estimate, 2025 USD. |
| Address | Huawei, Horinger, China |
| Coordinates | 40.29525, 111.90450 (city level) |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2023-10-08 | 0 | 0 | Land clearing begins simultaneously for all three zones (West, North, and South) after an official ceremony. The West and South zones later have the cooling capacity indicative of AI workloads, while the North Zone does not. |
| 2025-02-24 | 0 | 0 | In the West Zone, Building 1 is structurally complete. In the South Zone, Building 4 is structurally complete except for several cooling towers to be installed later. Buildings 2 (West Zone) and 5 (South Zone) have shells under construction. |
| 2025-06-08 | 0 | 0 | In the South Zone, paving and landscaping around Building 4 is mostly complete, while Building 5 still needs cooling and backup generators to be installed. |
| 2025-06-11 | 53 MW | 19,000 | In the West Zone, Building 1 is operational, based on its structural completion and colored motion artifacts on some of the cooling tower fans. |
| 2026-03-05 | 53 MW | 19,000 | Building 1 appears to have condensed water vapor above some cooling towers, suggesting they are still operating. Cooling towers have been added to Building 4, but we do not see any condensed water vapor, and there is still a crane over the building. So we don't think Building 4 is operational at full capacity yet. |
| 2026-05-12 | 109 MW | 41,000 | Building 4 is operational, based on its structural completion, the colored motion artifacts on some of the cooling tower fans, and cars parked out front (between the main building and the backup generator enclosure). Building 5 is almost structurally complete, but there is still some work to do in front of the backup generator enclosure. |
| 2026-06-07 | 109 MW | 41,000 | In the West Zone, Building 2 is structurally complete but still has some construction equipment around it. |
| 2026-08-18 | 212 MW | 81,000 | In the South Zone, Building 5 is operational, based on its structural completion, and the colored motion artifacts on the some of the cooling tower fans. Building 6 (South Zone) is under construction. In the West Zone, Building 3 has not begun construction. |
| 2026-12-22 (projected) | 271 MW | 104,000 | In the West Zone, Building 2 is operational (estimate). A local government announcement said a "completion acceptance filing" was completed for Building 2 around September 23, 2026, "marking a critical step toward the project's entry into operation". We assume this corresponds to structural completion, since there was minimal construction activity by August 18th. We then allow 3 more months for a full fit-out of AI servers. |
| 2028-02-17 (projected) | 439 MW | 141,000 | Building 6 (South Zone) is operational (estimate). This was the only new building under construction as of August 2026. We estimate the operational date based on an average of (1) previous buildings taking about 2 years on average from starting the building shell to becoming operational at ~full capacity, (2) a similar building at the Huawei Wuhu campus taking an estimated 550 days to become fully operational. Building 6 can reportedly support 100,000 AI accelerator cards and will deploy Huawei Ascend 950 chips. Based on the timing, we assume it has capacity for 100,000 Ascend 950DT chips (Ascend 950DT is ramping a few months later than 950PR). As with the other buildings, we multiply this capacity by the reported rack occupancy rate for the Horinger New Area (about 76%). |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2025-06-11 | Ascend 910C | 23,081 | Estimate |
| 2025-06-11 | Ascend 910B | 7,694 | Estimate |
| 2026-05-12 | Ascend 910C | 51,528 | Estimate |
| 2026-08-18 | Ascend 910C | 104,716 | Estimate |
| 2026-12-22 | Ascend 910C | 134,454 | Estimate |
| 2028-02-17 | Ascend 950DT | 75,614 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Huawei Horinger use?
Public data puts the facility power at about 212 MW, with about 439 MW planned by 2028. Reported (Epoch AI or owner data).
What chips does Huawei Horinger use?
Reported chips: Ascend 910C, Ascend 910B.
Who operates Huawei Horinger?
Huawei.
More Huawei data centers
- Huawei Wuhu China
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.