HostSlim
HostSlim is an operational data center operated by HostSlim in Woerden, Netherlands. Our footprint estimate of its power is about 22 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | HostSlim |
| Facility power | 22 MW (range 11 MW to 35 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,604 m² building outline x 5 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 9,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Switch Datacenters AMS2 |
| Address | Polanerbaan 1, 3447 GN Woerden |
| Opened | 1999 |
| Coordinates | 52.08249, 4.89273 |
| Website | hostslim.eu |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does HostSlim use?
We estimate the facility power at about 22 MW. Estimate from building footprint, low confidence.
Who operates HostSlim?
HostSlim.
Data centers near Woerden
- Switch Datacenters AMS2 77 m
- Data center in De Meern 8.8 km
- Alticom - IJsselstein 14.0 km
- NorthC Nieuwegein 16.1 km
- Eurofiber Datacenter Utrecht 1 17.7 km · 3.4 MW
- Cellnex Datacenter Alphen aan den Rijn 17.9 km
- GrafiX Internet B.V. - Alphen 18.1 km
- NorthC Aalsmeer 21.3 km · 12 MW