GSIC TSUBAME 3.0
GSIC TSUBAME 3.0 is an operational AI data center operated by Tokyo Institute of Technology in Okayama, Japan. Its power is about 2.7 MW. Epoch AI estimates about 23 H100-equivalent AI chips (NVIDIA Tesla K20X, NVIDIA Tesla P100 SXM2).
Key facts
| Status | Operational |
|---|---|
| Operator | Tokyo Institute of Technology |
| Facility power | 2.7 MW Reported (Epoch AI or owner data) |
| AI compute | 23 H100-equivalents |
| AI chips | NVIDIA Tesla K20X, NVIDIA Tesla P100 SXM2 Reported (Epoch AI or owner data) |
| Chip count | 4,224 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 1,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Ookayama, Japan |
| Coordinates | 34.66251, 133.92426 |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| GSIC TSUBAME 2.5 | NVIDIA Tesla K20X | 4,224 | 2.7 MW | 2014-06-01 |
| GSIC TSUBAME 3.0 | NVIDIA Tesla P100 SXM2 | 2,156 | 1.5 MW | 2017-11-01 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does GSIC TSUBAME 3.0 use?
Public data puts the facility power at about 2.7 MW. Reported (Epoch AI or owner data).
What chips does GSIC TSUBAME 3.0 use?
Reported chips: NVIDIA Tesla K20X, NVIDIA Tesla P100 SXM2.
Who operates GSIC TSUBAME 3.0?
Tokyo Institute of Technology.
Data centers near Okayama
- NTT 246 m · 17 MW
- ドコモ 1.7 km
- NTT 3.1 km
- TOKAIコミュニケーションズ data center in Okayama 8.2 km
- 日立 data center in Okayama 8.4 km
- KDDI 37.3 km
- NTTドコモ 37.7 km
- STNet data center in Takamatsu 39.5 km
More Tokyo Institute of Technology data centers
- TSUBAME4.0 Japan
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.