Grupo IDDEA
Grupo IDDEA is an operational data center in Guadalajara, Mexico. Our footprint estimate of its power is about 13 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 13 MW (range 6.5 MW to 21 MW) Estimate from building footprint, low confidence. Footprint estimate: about 10,825 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 20.63743, -103.37073 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Grupo IDDEA use?
We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.
Data centers near Guadalajara
- HostDime GDL Mexico Data Center 3.6 km
- ATC Edge GDL/E1 8.6 km
- Megacable Data Center - Guadalajara 9.7 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.