GreenNode Bangkok Cluster
GreenNode Bangkok Cluster is an operational AI data center operated by VNG in Huamak, Thailand. Its power is about 1.5 MW. Epoch AI estimates about 1,024 H100-equivalent AI chips (NVIDIA H100 SXM5 80GB).
Key facts
| Status | Operational |
|---|---|
| Operator | VNG |
| Facility power | 1.5 MW Reported (Epoch AI or owner data) |
| AI compute | 1,024 H100-equivalents |
| AI chips | NVIDIA H100 SXM5 80GB Reported (Epoch AI or owner data) |
| Chip count | 1,024 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 620 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | 1 Soi Ramkhamhaeng 28, Hua Mak, Khet Bang Kapi, Bangkok 10240, Thailand |
| Coordinates | 13.75200, 100.64038 |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| GreenNode Bangkok Cluster | NVIDIA H100 SXM5 80GB | 1,024 | 1.5 MW | 2024-06-25 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does GreenNode Bangkok Cluster use?
Public data puts the facility power at about 1.5 MW. Reported (Epoch AI or owner data).
What chips does GreenNode Bangkok Cluster use?
Reported chips: NVIDIA H100 SXM5 80GB.
Who operates GreenNode Bangkok Cluster?
VNG.
Data centers near Huamak
- STTGDC BKK2 1.0 km · 2.4 MW
- Arise IDC - Bangkok Central 2, Thailand 2.6 km
- STTGDC BKK1 2.9 km
- Telehouse – Bangkok 7.3 km · 1.1 MW
- Damac Digital Thailand (BKK01) 7.3 km · 4.9 MW
- CS LoxInfo Data Center - CW Tower 7.5 km
- Data center in Khan Na Yao 7.5 km · 0.6 MW
- Arise IDC - Bangkok Central 1, Thailand 7.7 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.