Government Data Centre
Government Data Centre is an operational data center in Gāndhī Nagar, India. Our footprint estimate of its power is about 6.2 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 6.2 MW (range 3.1 MW to 9.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,718 m² building outline x 3 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 13.01776, 80.23996 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Government Data Centre use?
We estimate the facility power at about 6.2 MW. Estimate from building footprint, low confidence.
Data centers near Gāndhī Nagar
- Sify Tidel-DC- Chennai 3.3 km
- Bharti Airtel Santhome 3.6 km
- Reliance Chennai IDC 5.4 km
- STTGDC CHN1 7.0 km
- NIXI Chennai STT 7.1 km
- Colt Data Center 11.7 km · 43 MW
- NTT 12.0 km · 19 MW
- Iron Mountain Data Center 12.0 km · 2.1 MW