Data Center Directory

Evolink Data Center Sofia 2

Evolink Data Center Sofia 2 is an operational data center operated by EVOLINK EAD in Sofia, Bulgaria. Our footprint estimate of its power is about 0.7 MW.

Key facts

StatusOperational
OperatorEVOLINK EAD
Facility power0.7 MW (range 0.4 MW to 1.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 584 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks10 networks, 1 internet exchanges
PeeringDB.
Also known asEvolink
Address16V, Barzaritsa St., Ovcha Kupel District
Coordinates42.67737, 23.25993
Websiteevolink.com/services/colocation/evolink-datacenter-sofia-2

Satellite view

Questions

How much power does Evolink Data Center Sofia 2 use?

We estimate the facility power at about 0.7 MW. Estimate from building footprint, low confidence.

Who operates Evolink Data Center Sofia 2?

EVOLINK EAD.

Data centers near Sofia

More EVOLINK EAD data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.