Euclyde DC5
Euclyde DC5 is an operational data center operated by Euclyde in Villeurbanne, France. Our footprint estimate of its power is about 1.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Euclyde |
| Facility power | 1.4 MW (range 0.7 MW to 2.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,182 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 45.77248, 4.87154 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Euclyde DC5 use?
We estimate the facility power at about 1.4 MW. Estimate from building footprint, low confidence.
Who operates Euclyde DC5?
Euclyde.
Data centers near Villeurbanne
- nLighten Lyon LYS1 61 m
- Centre de Calculs et de Données LyonTech-la Doua 1.1 km · 1.1 MW
- Extension centre de calcul IN2P3 1.2 km · 1.4 MW
- CC IN2P3 1.2 km
- Colt Lyon 1.5 km
- SynAApS 1.9 km
- Orange Lyon Lumière - Centrale 2.0 km · 53 MW
- Lyon Sévigné 2.7 km
Sources