Equinix PA2 - Paris, Saint-Denis
Equinix PA2 - Paris, Saint-Denis is an operational data center operated by Equinix in Paris, France. Our footprint estimate of its power is about 69 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 69 MW (range 35 MW to 111 MW) Estimate from building footprint, low confidence. Footprint estimate: about 28,867 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 29,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 151 networks, 5 internet exchanges PeeringDB. |
| Also known as | Equinix PA3 - Paris, Saint-Denis · Reliance St. Denis · Equinix PA3 · Equinix PA10 · Equinix PA9X |
| Address | Rue Ambroise Croizat, 114, Saint-Denis |
| Coordinates | 48.92717, 2.35066 |
| Website | equinix.com/locations/france-colocation/paris-data-centers/pa2 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix PA2 - Paris, Saint-Denis use?
We estimate the facility power at about 69 MW. Estimate from building footprint, low confidence.
Who operates Equinix PA2 - Paris, Saint-Denis?
Equinix.
Data centers near Paris
- Equinix PA10 - Paris, Saint-Denis 152 m · 27 MW
- Ad Valem Technologies - France (Saint-Denis) 695 m
- Datacenter EDF 1.0 km
- Datacenter RTE 1.1 km
- Digital Realty Paris PAR3 1.6 km · 4 MW
- MCI/Verizon Paris St Denis 2.0 km
- Equinix PA6 - Paris, Condorcet 2.3 km · 9.2 MW
- nLighten Paris PAR2 2.6 km · 2.4 MW
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.