Equinix OT1 - Ottawa
Equinix OT1 - Ottawa is an operational data center operated by Equinix in Gatineau, Canada. Our footprint estimate of its power is about 5.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 5.8 MW (range 2.9 MW to 9.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,837 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Equinix OT1 |
| Address | 200 Avenue Lépine |
| Coordinates | 45.57535, -75.39812 |
| Website | equinix.com/locations/americas-colocation/canada-colocation/ottawa-data-centers/ot1 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix OT1 - Ottawa use?
We estimate the facility power at about 5.8 MW. Estimate from building footprint, low confidence.
Who operates Equinix OT1 - Ottawa?
Equinix.
Data centers near Gatineau
- PureColo OTT02 (Ottawa DC2) 34.6 km
- DNSnetworks IDC1 40.9 km
- PureColo OTT01 (Ottawa DC1) 47.7 km
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.