Equinix Abu Dhabi AD1
Equinix Abu Dhabi AD1 is an operational data center operated by Equinix in Khalifah A City, United Arab Emirates. Our footprint estimate of its power is about 27 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 27 MW (range 14 MW to 44 MW) Estimate from building footprint, low confidence. Footprint estimate: about 22,789 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 12,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 24.41893, 54.62231 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix Abu Dhabi AD1 use?
We estimate the facility power at about 27 MW. Estimate from building footprint, low confidence.
Who operates Equinix Abu Dhabi AD1?
Equinix.
Data centers near Khalifah A City
- Khazna Data Center – Abu Dhabi 136 m
- Khazna Data Center - AUH 6 247 m
- Khazna Data Centers Apollo (1 - 6) 19.3 km
- Amazon Web Services 23.2 km · 19 MW
- Gulf Data Hub ICAD 1 23.8 km · 13 MW
- G42 Artemis 25.1 km · 1.2 MW
- Stargate UAE Abu Dhabi 34.3 km
- Amazon Web Services 34.4 km · 20 MW
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.