포스코DX 충주클라우드데이터센터
포스코DX 충주클라우드데이터센터 is an operational data center in Chungju, South Korea. Our footprint estimate of its power is about 4.8 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 4.8 MW (range 2.4 MW to 7.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,988 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 37.00287, 127.81712 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does 포스코DX 충주클라우드데이터센터 use?
We estimate the facility power at about 4.8 MW. Estimate from building footprint, low confidence.
Data centers near Chungju
- 각 세종 69.5 km · 46 MW
- Jukjeon Data center 70.6 km
- Lotte Yongin 71.0 km
- SKbroadbandidc 72.7 km
- kt cloud Bundang 73.0 km
- KINX Bundang 76.5 km
- 전상동 82.0 km · 29 MW
- KR1 강남데이터센터 85.6 km · 20 MW