DC North is an operational data center operated by CRATIS in Varaždin, Croatia. Our footprint estimate of its power is about 3.1 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CRATIS |
| Facility power | 3.1 MW (range 1.5 MW to 4.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,571 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 6 networks, 1 internet exchanges PeeringDB. |
| Address | Ivane Brlić-Mažuranić 30 |
| Coordinates | 46.28192, 16.36040 |
| Website | dcnorth.hr |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does DC North use?
We estimate the facility power at about 3.1 MW. Estimate from building footprint, low confidence.
Who operates DC North?
CRATIS.
Data centers near Varaždin
- Data Link 56.3 km
- Podatkovni centar HR-ZOO ZG2 57.4 km
- Hrvatski Telekom data center in Zagreb 59.9 km
- A1 Hrvatska Zagreb 60.7 km
- Digital Realty Zagreb (ZAG1) 62.2 km
- SRCE Zagreb 62.2 km
- EuroHPC Vega 62.7 km · 0.2 MW
- Podatkovni centar Hrvatskog telekoma 62.8 km