Datenverarbeitungszentrum Mecklenburg-Vorpommern is an operational data center in Lankow, Germany. Our footprint estimate of its power is about 5.3 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 5.3 MW (range 2.1 MW to 13 MW) Estimate from building footprint, low confidence. Footprint estimate: about 44,305 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 2,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 53.64697, 11.38111 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Datenverarbeitungszentrum Mecklenburg-Vorpommern use?
We estimate the facility power at about 5.3 MW. Estimate from building footprint, low confidence.
Data centers near Lankow
- Planet IC 5.9 km · 1.4 MW
- PLANET IC V (Schwerin) 6.0 km
- ITSMZ 27.2 km · 3.6 MW
- CSN Solutions - Kehrsen 39.7 km
- CSN Solutions Gudow 40.9 km
- LYNET Lübeck 52.4 km