Datencenter 1 - Hall in Tirol
Datencenter 1 - Hall in Tirol is an operational data center operated by HALLAG Kommunal in Hall in Tirol, Austria. No power figure is public for this site yet. Likely chips: Huawei Ascend and NVIDIA China-market GPUs (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | HALLAG Kommunal |
| AI chips | Huawei Ascend and NVIDIA China-market GPUs Guess from the operator, not confirmed. Chinese operators use Huawei Ascend and export-limited NVIDIA chips. |
| Networks | 3 networks, 1 internet exchanges PeeringDB. |
| Address | Augasse 6 |
| Coordinates | 47.27793, 11.50305 |
| Website | cityet.at |
Power and grid
| Grid carbon intensity | 117 g CO₂ per kWh (Austria, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 51.9%, solar 14.1%, gas 11.9%, wind 11.4%, bioenergy 6.3%. Clean power: 83.6% |
| Industrial power price | EUR 0.150 per kWh (Austria, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 5.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.7 °C (2001 to 2025) |
| Cooling degree days | 30 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.34 kWh per m² per day |
| Wind at 50 m | 2.8 m/s average |
| Water stress today | Low (<10%) (Austria) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
What chips does Datencenter 1 - Hall in Tirol use?
No chips are reported. Based on the operator, the likely chips are Huawei Ascend and NVIDIA China-market GPUs.
How clean is the power for Datencenter 1 - Hall in Tirol?
The grid in Austria emits about 117 g CO₂ per kWh (2025). Largest sources: hydro 51.9%, solar 14.1%, gas 11.9%.
Who operates Datencenter 1 - Hall in Tirol?
HALLAG Kommunal.
Data centers near Hall in Tirol
- Datencenter 3 - Innsbruck 5.3 km
- IKB - Rechenzentrum Karwendel 6.7 km
- IKB - Rechenzentrum1 8.2 km
- DataGrid Network Germany 75.9 km
More HALLAG Kommunal data centers
- Datencenter 3 - Innsbruck Austria
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.