Datacenter France Travail
Datacenter France Travail is an operational data center operated by France Travail in Castelnau-le-Lez, France. Our footprint estimate of its power is about 2.3 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | France Travail |
| Facility power | 2.3 MW (range 1.1 MW to 3.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,896 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 980 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 43.62627, 3.90928 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Datacenter France Travail use?
We estimate the facility power at about 2.3 MW. Estimate from building footprint, low confidence.
Who operates Datacenter France Travail?
France Travail.
Data centers near Castelnau-le-Lez
- Data center in Montpellier 776 m · 2.7 MW
- Cogent Montpellier 2.5 km
- GENCI Adastra 3.1 km · 1.6 MW
- UltraEdge Montpellier 4.6 km
- Cogent Montpellier 4.7 km · 1.3 MW
- CINES 5.5 km · 6 MW
- Montpellier Internet Telecom Datacenter 5.5 km · 0.6 MW
- System-Net HDC 1 5.5 km