Datacenter Completel
Datacenter Completel is an operational data center operated by Completel in Aubervilliers, France. Our footprint estimate of its power is about 7.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Completel |
| Facility power | 7.8 MW (range 3.9 MW to 12 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,481 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 48.91015, 2.39523 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Datacenter Completel use?
We estimate the facility power at about 7.8 MW. Estimate from building footprint, low confidence.
Who operates Datacenter Completel?
Completel.
Data centers near Aubervilliers
- Orange - Aubervilliers 102 m · 15 MW
- Datacenter Atos 164 m · 11 MW
- Equinix PA4 - Paris, Pantin 1.6 km
- Bouygues Télécom data center in La Courneuve 1.6 km · 0.9 MW
- Digital Realty Paris PAR7 1.7 km
- Interxion PAR7 1.8 km · 6.8 MW
- Digital Realty Paris PAR2 1.9 km · 15 MW
- Digital Realty Paris PAR5 1.9 km · 2.6 MW
More Completel data centers
- Completel Val de Reuil France
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.