Data
Data is an operational data center operated by ITH Center in Mamoudzou, Mayotte. Our footprint estimate of its power is about 1.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | ITH Center |
| Facility power | 1.8 MW (range 0.9 MW to 3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 513 m² building outline x 3 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 770 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Boulevard Younoussa Bamana 629, 97600, Mamoudzou |
| Coordinates | -12.77846, 45.22521 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data use?
We estimate the facility power at about 1.8 MW. Estimate from building footprint, low confidence.
Who operates Data?
ITH Center.
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.