Data Centre is an operational data center in Otara, New Zealand. Our footprint estimate of its power is about 4.9 MW.

Key facts

StatusOperational
Facility power4.9 MW (range 2.4 MW to 7.8 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,059 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressLady Ruby Drive 61
Coordinates-36.94807, 174.90229