Data center in Umeki
Data center in Umeki is an operational data center in Umeki, Japan. Our footprint estimate of its power is about 0.9 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 0.9 MW (range 0.4 MW to 1.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 743 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 380 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 31.62766, 130.33458 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Umeki use?
We estimate the facility power at about 0.9 MW. Estimate from building footprint, low confidence.
Data centers near Umeki
- NTT 18.6 km · 1.4 MW
- NTT 18.9 km · 1.4 MW
- NTT 20.9 km · 0.8 MW
- NTT 21.7 km · 29 MW
- Next-MIC DataCenter 21.7 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.