Data Center Directory

Data center in Mikkeli

Data center in Mikkeli is a data center under construction in Mikkeli, Finland. Our footprint estimate of its power is about 16 MW.

Key facts

StatusUnder construction
Facility power16 MW (range 7.9 MW to 25 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 13,096 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 6,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates61.71487, 27.32769

Satellite view

Questions

How much power does Data center in Mikkeli use?

We estimate the facility power at about 16 MW. Estimate from building footprint, low confidence.

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.