Data center in Melegnano is an operational data center in Melegnano, Italy. Our footprint estimate of its power is about 13 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 13 MW (range 6.5 MW to 21 MW) Estimate from building footprint, low confidence. Footprint estimate: about 10,842 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 45.35366, 9.30992 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Melegnano use?
We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.
Data centers near Melegnano
- Vaultica Data Centers | MIL01 8.5 km · 12 MW
- STACK MILL1B 8.7 km · 12 MW
- Data center in San Donato Milanese 8.7 km
- STACK MILL2 8.8 km · 8.4 MW
- Data center in Siziano 8.9 km
- Microsoft data center in Paullo 10.3 km · 8.6 MW
- Equinix ML3 - Milan, Basiglio 12.7 km · 2.1 MW
- MOMIT Milan 13.2 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.