Data center in Königstädten is an operational data center in Königstädten, Germany. Our footprint estimate of its power is about 8.4 MW.

Key facts

StatusOperational
Facility power8.4 MW (range 4.2 MW to 13 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 6,966 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates49.97541, 8.45322

Satellite view

Questions

How much power does Data center in Königstädten use?

We estimate the facility power at about 8.4 MW. Estimate from building footprint, low confidence.