Data center in Jobstown
Data center in Jobstown is an operational data center in Jobstown, Ireland. Our footprint estimate of its power is about 9.2 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 9.2 MW (range 4.6 MW to 15 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,626 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 53.29358, -6.41368 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Jobstown use?
We estimate the facility power at about 9.2 MW. Estimate from building footprint, low confidence.
Data centers near Jobstown
- Equinix Dublin DB1 241 m · 4.7 MW
- Eir Hosting Services 250 m · 4.6 MW
- euNetworks (Global Voice) 283 m · 9.7 MW
- Eircom Dublin (Citywest) 321 m
- Equinix DB1 - Dublin, CityWest 464 m
- Digital Realty DUB3 2.9 km · 5.8 MW
- Dave Geoghegan 2.9 km
- Amazon Web Services 3.1 km · 13 MW