Data center in Hutang is an operational data center in Hutang, China. Our footprint estimate of its power is about 5.6 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 5.6 MW (range 2.8 MW to 9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,682 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 31.67614, 119.57173 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Hutang use?
We estimate the facility power at about 5.6 MW. Estimate from building footprint, low confidence.
Data centers near Hutang
- 江南农村商业银行数据中心 5.5 km · 3.9 MW
- Data center in Zhenzhou 72.1 km · 7.1 MW
- Data center in Zhenzhou 72.1 km · 7.1 MW
- Data center in Zhenzhou 72.6 km · 13 MW
- Data center in Zhenzhou 72.7 km · 13 MW
- Data center in Zhenzhou 72.8 km · 14 MW
- Data center in Zhenzhou 72.9 km · 12 MW
- Data center in Zhenzhou 72.9 km · 13 MW