Data center in Hrodna
Data center in Hrodna is an operational data center in Hrodna, Belarus. Our footprint estimate of its power is about 2.9 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 2.9 MW (range 1.4 MW to 4.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,197 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | вуліца Карскага 12 |
| Coordinates | 53.68340, 23.88216 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Hrodna use?
We estimate the facility power at about 2.9 MW. Estimate from building footprint, low confidence.
Data centers near Hrodna
- Orange Polska // Białystok 77.4 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.