Data center in Geoje
Data center in Geoje is an operational data center in Geoje, South Korea. Our footprint estimate of its power is about 4.2 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 4.2 MW (range 2.1 MW to 6.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,735 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 34.77776, 128.64097 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Geoje use?
We estimate the facility power at about 4.2 MW. Estimate from building footprint, low confidence.
Data centers near Geoje
- Data center in Kimhae 56.3 km · 7 MW
- Digital Edge PUS1 - Busan 62.6 km
- kt cloud Songjeong GHC 67.4 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.