Data Center Directory

Data center in Dunstable

Data center in Dunstable is an operational data center in Dunstable, United Kingdom. Our footprint estimate of its power is about 8.6 MW.

Key facts

StatusOperational
Facility power8.6 MW (range 4.3 MW to 14 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 7,150 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressHumphrys Road, LU5 4TB, Dunstable
Coordinates51.89774, -0.50132

Satellite view

Questions

How much power does Data center in Dunstable use?

We estimate the facility power at about 8.6 MW. Estimate from building footprint, low confidence.

Data centers near Dunstable

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.