Data center in Circoiscrizione III is an operational data center in Circoiscrizione III, Italy. Our footprint estimate of its power is about 3.2 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 3.2 MW (range 1.6 MW to 5.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,661 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 45.06093, 7.63910 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Circoiscrizione III use?
We estimate the facility power at about 3.2 MW. Estimate from building footprint, low confidence.
Data centers near Circoiscrizione III
- CSI Piemonte 2.7 km
- Data center in San Donato 2.8 km
- BBBell Torino 3.6 km
- ITGate PdF (TRN1/TRN2) 3.7 km
- Retelit S.p.A. Torino 3.8 km
- COLT Datacenter Turin 4.0 km
- Noovle DC Rivoli 6.9 km · 8.1 MW
- Datacenter TIM-Google 11.6 km · 11 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.