Data Center Directory

Data center in Cherry Orchard

Data center in Cherry Orchard is an operational data center in Cherry Orchard, Ireland. Our footprint estimate of its power is about 16 MW.

Key facts

StatusOperational
Facility power16 MW (range 7.9 MW to 25 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 13,107 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 6,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates53.33046, -6.38213

Satellite view

Questions

How much power does Data center in Cherry Orchard use?

We estimate the facility power at about 16 MW. Estimate from building footprint, low confidence.

Data centers near Cherry Orchard

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.