Data center in Cherry Orchard
Data center in Cherry Orchard is an operational data center in Cherry Orchard, Ireland. Our footprint estimate of its power is about 16 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 16 MW (range 7.9 MW to 25 MW) Estimate from building footprint, low confidence. Footprint estimate: about 13,107 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 53.33046, -6.38213 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Cherry Orchard use?
We estimate the facility power at about 16 MW. Estimate from building footprint, low confidence.
Data centers near Cherry Orchard
- VDC2 Viatel Parkwest 333 m
- Digital Realty Dublin DUB1-2 1.2 km
- Digital Realty DUB2 1.3 km · 0.7 MW
- CyrusOne Dublin 1 3.8 km
- Microsoft DSF 3.9 km · 9 MW
- Microsoft DUB06 3.9 km · 24 MW
- Amazon Web Services 4.0 km · 13 MW
- Digital Realty Dublin DUB3 4.0 km · 5.2 MW