Data Center Directory

Data center in Bogatyye Saby

Data center in Bogatyye Saby is an operational data center in Bogatyye Saby, Russia. Our footprint estimate of its power is about 1.9 MW.

Key facts

StatusOperational
Facility power1.9 MW (range 0.9 MW to 3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 777 m² building outline x 2 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 810 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Addressулица Тынычлык 22
Opened2017
Coordinates56.00061, 50.42837

Satellite view

Questions

How much power does Data center in Bogatyye Saby use?

We estimate the facility power at about 1.9 MW. Estimate from building footprint, low confidence.

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.