CSquare London LHR3
CSquare London LHR3 is an operational data center operated by CSquare in Lower Earley, United Kingdom. Our footprint estimate of its power is about 20 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CSquare |
| Facility power | 20 MW (range 9.9 MW to 32 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,214 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 8,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 51.43735, -0.88738 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CSquare London LHR3 use?
We estimate the facility power at about 20 MW. Estimate from building footprint, low confidence.
Who operates CSquare London LHR3?
CSquare.
Data centers near Lower Earley
- Centersquare London (LHR3) 458 m
- Microsoft Thames Valley Park Data Centre 3.8 km
- Pulsant Reading SE-4 (East) 4.5 km · 0.9 MW
- Asanti - Reading 6.0 km · 2.1 MW
- Pulsant 6.2 km · 1.1 MW
- Wavenet Reading 6.2 km
- Redcentric Reading 6.4 km · 3.7 MW
- Pulsant Reading SE-3 (South) 6.5 km · 7.1 MW
More CSquare data centers
- Csquare SFO2 United States
- Csquare SFO1 United States
- Csquare SFO4 United States
Sources
Correct this page or get the data