CPD Gobierno de Navarra is an operational data center operated by Nasertic in Pamplona, Spain. Our footprint estimate of its power is about 1.7 MW.

Key facts

StatusOperational
OperatorNasertic
Facility power1.7 MW (range 0.9 MW to 2.7 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,424 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 730 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates42.81779, -1.65969

Satellite view

Questions

How much power does CPD Gobierno de Navarra use?

We estimate the facility power at about 1.7 MW. Estimate from building footprint, low confidence.

Who operates CPD Gobierno de Navarra?

Nasertic.

Data centers near Pamplona

More Nasertic data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.