conova - Datacenter 6/7 is an operational data center operated by conova communications in Hallein, Austria. Our footprint estimate of its power is about 1.6 MW.

Key facts

StatusOperational
Operatorconova communications
Facility power1.6 MW (range 0.8 MW to 2.6 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,333 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 680 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks1 networks, 1 internet exchanges
PeeringDB.
Also known asConova Communications
AddressSolvay-Halvic-Strasse 70
Coordinates47.70616, 13.08283
Websiteconova.com

Power and grid

Grid carbon intensity117 g CO₂ per kWh (Austria, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 51.9%, solar 14.1%, gas 11.9%, wind 11.4%, bioenergy 6.3%. Clean power: 83.6%
Industrial power priceEUR 0.150 per kWh (Austria, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Water stress todayLow (<10%) (Salzburg)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does conova - Datacenter 6/7 use?

We estimate the facility power at about 1.6 MW. Estimate from building footprint, low confidence.

How clean is the power for conova - Datacenter 6/7?

The grid in Austria emits about 117 g CO₂ per kWh (2025). Largest sources: hydro 51.9%, solar 14.1%, gas 11.9%.

Who operates conova - Datacenter 6/7?

conova communications.

Data centers near Hallein

More conova communications data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.