Data Center Directory

CKW Colo Sursee

CKW Colo Sursee is an operational data center operated by CKW Fiber Services in Schenkon, Switzerland. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorCKW Fiber Services
AddressNeuheim 3
Coordinates47.18594, 8.12098
Websiteckw.ch/ict-loesungen/datacenter-services/datacenter-services

Power and grid

Grid carbon intensity39 g CO₂ per kWh (Switzerland, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.3%, nuclear 29.9%, solar 12.1%, oil and other fossil 1.9%, bioenergy 1.6%. Clean power: 97.7%

Climate and water

Average temperature7.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature31.7 °C (2001 to 2025)
Cooling degree days60 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.4 kWh per m² per day
Wind at 50 m3.5 m/s average
Water stress todayLow (<10%) (Lucerne)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How clean is the power for CKW Colo Sursee?

The grid in Switzerland emits about 39 g CO₂ per kWh (2025). Largest sources: hydro 52.3%, nuclear 29.9%, solar 12.1%.

Who operates CKW Colo Sursee?

CKW Fiber Services.

Data centers near Schenkon

More CKW Fiber Services data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.