Cirion Centro de Datos LIM2
Cirion Centro de Datos LIM2 is an operational data center in Villa Poeta José Gálvez Barrenechea, Peru. Our footprint estimate of its power is about 6.4 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 6.4 MW (range 3.2 MW to 10 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,372 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -12.25807, -76.82584 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Cirion Centro de Datos LIM2 use?
We estimate the facility power at about 6.4 MW. Estimate from building footprint, low confidence.
Data centers near Villa Poeta José Gálvez Barrenechea
- GTD Centro de Datos Lurín 164 m · 2.2 MW
- Telxius Lima DC 5.0 km
- America Movil Telepuerto VES 15.7 km
- Internexa Lima San Juan 18.4 km
- GTD Peru Data Center 22.1 km
- Cirion Lima - LIM1 24.2 km
- EdgeUno Datacenter Lima Peru (LIM1) 24.7 km
- Internexa Lima Surco 24.8 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.