Data Center Directory

Cirion Centro de Datos LIM2

Cirion Centro de Datos LIM2 is an operational data center in Villa Poeta José Gálvez Barrenechea, Peru. Our footprint estimate of its power is about 6.4 MW.

Key facts

StatusOperational
Facility power6.4 MW (range 3.2 MW to 10 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,372 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates-12.25807, -76.82584

Satellite view

Questions

How much power does Cirion Centro de Datos LIM2 use?

We estimate the facility power at about 6.4 MW. Estimate from building footprint, low confidence.

Data centers near Villa Poeta José Gálvez Barrenechea

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.