CHAKTOMUK DATA CENTER
CHAKTOMUK DATA CENTER is an operational data center operated by CHAKTOMUK DATA CENTER in Phnom Penh, Cambodia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | CHAKTOMUK DATA CENTER |
| Networks | 2 networks PeeringDB. |
| Address | Corner St. 598 and St. 777, Sangkat Toul Sangke II |
| Coordinates | 11.57755, 104.88764 |
| Website | chaktomuk-dc.com.kh |
Power and grid
| Grid carbon intensity | 499 g CO₂ per kWh (Cambodia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 56.6%, hydro 29.9%, solar 10.6%, oil and other fossil 2.5%. Clean power: 40.9% |
Climate and water
| Average temperature | 28.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.8 °C (2001 to 2025) |
| Cooling degree days | 3,788 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.29 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Low - Medium (10-20%) (Phnom Penh) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for CHAKTOMUK DATA CENTER?
The grid in Cambodia emits about 499 g CO₂ per kWh (2025). Largest sources: coal 56.6%, hydro 29.9%, solar 10.6%.
Who operates CHAKTOMUK DATA CENTER?
CHAKTOMUK DATA CENTER.
Data centers near Phnom Penh
- Cambodian SingMeng Telemedia Co., Ltd. 677 m
- CNX - Psa Depo (BSS) 1.9 km
- Telecom Cambodia Building 4.2 km
- Viettel (Cambodia) Pte. Ltd (VTC5) 4.3 km
- MekongNet DC 5.4 km
- MekongNet 5.4 km
- Sabay Digital - Tonle Basak (KPH) 6.5 km
Sources
Correct this page or get the data