Data Center Directory

Centro de Informática (CPD)

Centro de Informática (CPD) is an operational data center in Plano Piloto, Brazil. Our footprint estimate of its power is about 3.5 MW.

Key facts

StatusOperational
Facility power3.5 MW (range 1.8 MW to 5.6 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 977 m² building outline x 3 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates-15.77275, -47.86577

Satellite view

Questions

How much power does Centro de Informática (CPD) use?

We estimate the facility power at about 3.5 MW. Estimate from building footprint, low confidence.

Data centers near Plano Piloto

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.