Centro de datos NextStream MEXIX01
Centro de datos NextStream MEXIX01 is an operational data center operated by Nextstream in San Bartolo del Llano, Mexico. Our footprint estimate of its power is about 2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Nextstream |
| Facility power | 2 MW (range 0.8 MW to 5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 16,588 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 850 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 19.57881, -99.74945 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centro de datos NextStream MEXIX01 use?
We estimate the facility power at about 2 MW. Estimate from building footprint, low confidence.
Who operates Centro de datos NextStream MEXIX01?
Nextstream.
Data centers near San Bartolo del Llano
- ATC Edge TOL/E1 36.3 km
- KIO México 6 (MEX6) 37.7 km
- Centro de datos KIO MEX6 46.6 km · 4 MW
- KIO México 4 (MEX4) 53.6 km · 0.7 MW
- MTP Sites Mexico City Santa Fe DC 54.6 km
- Centro de datos KIO MEX2 54.7 km · 0.6 MW
- Centro de datos KIO MEX1 55.0 km · 1.1 MW
- KIO México 3 (MEX3) 56.2 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.