Centro de datos Equinix MO1
Centro de datos Equinix MO1 is an operational data center operated by Equinix in Ciudad Apodaca, Mexico. Our footprint estimate of its power is about 0.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 0.7 MW (range 0.3 MW to 1.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,463 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 25.76669, -100.19333 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centro de datos Equinix MO1 use?
We estimate the facility power at about 0.7 MW. Estimate from building footprint, low confidence.
Who operates Centro de datos Equinix MO1?
Equinix.
Data centers near Ciudad Apodaca
- Triara Monterey 2.3 km
- Centro de datos Triara 2.4 km · 5.4 MW
- Equinix MO1 - Monterrey 3.3 km
- Equinix MO2 - Monterrey 7.6 km · 2.6 MW
- Neutral Networks Monterrey (MTY-NN) 16.6 km
- KIO Monterrey 1 (MTY1) 21.1 km
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.