Centro de datos Bleeding Edge QRO1
Centro de datos Bleeding Edge QRO1 is an operational data center operated by Bleeding Edge in La Cañada, Mexico. Our footprint estimate of its power is about 0.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Bleeding Edge |
| Facility power | 0.8 MW (range 0.3 MW to 2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,818 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 340 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 20.53504, -100.25100 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centro de datos Bleeding Edge QRO1 use?
We estimate the facility power at about 0.8 MW. Estimate from building footprint, low confidence.
Who operates Centro de datos Bleeding Edge QRO1?
Bleeding Edge.
Data centers near La Cañada
- Bleeding Edge QRO1 775 m
- Centro de datos ODATA QR03 1.5 km · 17 MW
- EdgeUno Datacenter Queretaro Mexico (QRO3) 3.3 km
- Centro de datos KIO QRO1 y QRO2 3.5 km · 3.4 MW
- KIO Querétaro 1 (QRO1) 3.7 km
- Equinix MX1/MX2 - Mexico City 3.7 km · 2.6 MW
- Amazon AWS Querétaro 7.8 km · 7 MW
- Centro de datos ODATA QR01 8.0 km · 3.3 MW
More Bleeding Edge data centers
- Bleeding Edge QRO1 Mexico
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.