Centro de datos Ascenty Querétaro 1 is an operational data center operated by Ascenty in Pedro Escobedo, Mexico. Our footprint estimate of its power is about 5.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Ascenty |
| Facility power | 5.5 MW (range 2.2 MW to 14 MW) Estimate from building footprint, low confidence. Footprint estimate: about 45,926 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 2,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 20.59186, -100.15458 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centro de datos Ascenty Querétaro 1 use?
We estimate the facility power at about 5.5 MW. Estimate from building footprint, low confidence.
Who operates Centro de datos Ascenty Querétaro 1?
Ascenty.
Data centers near Pedro Escobedo
- Data center in Pedro Escobedo 296 m · 11 MW
- Data center in Pedro Escobedo 852 m · 4 MW
- Ascenty QRO01 - Querétaro 1.0 km
- Centro de datos ODATA QR01 4.7 km · 3.3 MW
- Amazon AWS Querétaro 4.7 km · 7 MW
- Centro de datos ODATA QR03 10.6 km · 17 MW
- KIO Querétaro 1 (QRO1) 10.7 km
- EdgeUno Datacenter Queretaro Mexico (QRO3) 10.8 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.