Data Center Directory

Centre de Processament de Dades IBM

Centre de Processament de Dades IBM is an operational data center in Sant Cugat del Vallès, Spain. Our footprint estimate of its power is about 11 MW.

Key facts

StatusOperational
Facility power11 MW (range 5.7 MW to 18 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 9,440 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates41.48982, 2.10807

Satellite view

Questions

How much power does Centre de Processament de Dades IBM use?

We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.

Data centers near Sant Cugat del Vallès

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.